Courtis, B., and Deakin, C., GE Water and Process Technologies Ltd, UK PRESENTATION ONLY
(free)1. History of MBR in the UK WFD and p control.
2. A global perspective Size and BNR
3. Why install an MBR?
4. A LEAP forward in MBR technology
5. P removal a case study in evolution.
Historical demonstration of low p consent limits being achieved. Enables water companies to be confident of hitting WFD discharge standards. LEAP MBR reduction of capital costs has increased size of plants installed. Significantly reduced operational costs notably power.
Aqua Enviro Ltd
T: 0113 8730728
c/o Tidal Accounting, HQ Offices, Radley House, Richardshaw Road, Leeds, West Yorkshire, LS28 6LE